Fri 09 2020 10:09:27

Tashkent, Uzbekistan (UzDaily.com) - At well No. 10 of the OE of the South Mubarek field of the Mubarek Oil and Gas Production Department, after the completion of drilling, perforation was made in the interval 1970-1958 meters.

After the well was completed, an industrial gas flow was obtained with a daily flow rate of 100 thousand cubic meters and 1.1 tonnes of gas condensate.

Currently, work is underway to equip the well and connect it to a gas collector.

The South Mubarek oil and gas condensate field is located in the Mubarek district of the Kashkadarya region and was commissioned in 1978.

 
 

+998 71 2815040

14 Bobur street, Yakkasaroy tumani Tashkent, Uzbekistan


* - Required fields